Fig. 1From: Evaluating a pre-surgical health optimisation programme: a feasibility studyThe hip and knee pathway for health optimisation and non-health optimisation patients. Note: Non-health optimisation patients proceed immediately from the initial Hip and Knee team appointment to the 6-week ‘standard’ hip and knee pathwayBack to article page