Skip to main content

Table 2 Table of results

From: Optimising remote site airway management kit dump using the SCRAM bag—a randomised controlled trial

 

Trolley

SCRAM

 

n = 25

n = 25

 

Age, years (IQR)

34 (32–38.5)

36.5 (32–41)

p = 0.68

Years of experience, years (IQR)

8 (5.5–12)

7.5 (3.5–14.5)

p = 0.41

Completion time (s)

157 ± 45

112 ± 30

p = 0.0001

Errors (n, (IQR))

- Total

- Omission

- Checking

8 (5–9)

5 (3–7)

3 (2–4)

1 (1–3)

1 (1–2)

0 (0–1)

p = 0.03

Perceived challenge (mm)

50.64 ± 22.9

18.36 ± 16.4

p < 0.001